STAGE 01
Site survey and measured drawings
Taking site measurements; recording existing surfaces, levels, setting-out axes and installation tolerances.
- Measured drawings
- Axis and level plan
- Tolerance survey
- Existing surface record
TECHNICAL APPROACH
Continuous technical coordination, from site survey to final surface treatment.

INTEGRATED TECHNICAL PROCESS
We coordinate dimensions, materials and connection details, aligning fabrication and installation through installation and fabrication drawings.
SYSTEM ANATOMY
The visible face of a facade depends on the accuracy of the system behind it. In the mechanical subsystem we install, every layer from the structural wall to the stone face is connected through one consistent detailing logic.
STAGE 01
Taking site measurements; recording existing surfaces, levels, setting-out axes and installation tolerances.
STAGE 02
Development of stone setting-out, joint layouts, anchoring and supporting substructure systems; preparation of shop drawings including plans, sections and detailed connection drawings.
STAGE 03
Defining component codes, cutting lists, hole and groove positions; carrying out CNC machining and surface and edge finishing.
STAGE 04
Installation of anchors, supporting substructure, thermal insulation and membrane layers within the project scope; checks of setting-out axes, levels and connections.
STAGE 05
Installation of fabricated components to approved details; checks of joint widths, alignment, plumb and surface flatness.
STAGE 06
Completion of joints and connections; surface cleaning, necessary protective treatments and final installation checks.
Material, system and installation requirements vary from project to project. The process follows the contracted scope of works and approved project details.